Inspect parallel jobs directly on the build canvas
Parallel steps previously appeared as a single node on the build canvas, with individual jobs shown in a separate panel. Now you can expand them in place to see each job’s status, hover for timing details, and open its log.

Like matrix steps, failed parallel steps now start expanded and focus on failed jobs. Click show all to reveal the remaining jobs.

Open a build that uses a parallel step and switch to Canvas to explore its jobs.
Chris
You deserve better CI.
Get started for free with a full month of our all-access trial.